1 Overview
Mounting Model Naming Conventions
ear SUN2000-375W-USP0
– SUN2000: PV product series name
– 375W: maximum input power 375 W
– US: U.S. edition
– P: smart PV optimizer identifier
– 0: serial number
Port Definition




Label OUT+OUT– IN– IN+

Item Description

Name Electric Burn Grounding Direct Grounding Grounding the
shock warning current mode mounting ears
warning Protection level 6P

2 Installing the Optimizer
Secure the optimizer to a PV module support or PV module frame. The fittings required depend on the
installation position.
Installing the Optimizer on the Extruded Aluminum Profile of a PV Module Support
Assemble the flange Install the optimizer on Tighten the nut.
nut and optimizer. the extruded aluminum
profile.




1
Installing the Optimizer (Front Outwards) on a PV Module Frame

Install the frame Assemble the Secure the frame mounting bracket.
mounting bracket optimizer and the
on the back of the frame mounting
PV module frame. bracket.

PV module




Positioning pole Rooftop
NOTE
 The front of the optimizer should be at least 20
mm away from the rooftop.
 Do not press the optimizer mounting ear against
the positioning pole of the frame mounting
bracket.


Installing the Optimizer (Back Outwards) on a PV Module Frame
Install the frame Assemble the Secure the frame mounting bracket.
mounting bracket optimizer and the
on the back of the frame mounting
PV module frame. bracket.

PV module




Rooftop

NOTE
The front of the optimizer should be at least
10 mm away from the back of the PV module.
The frame mounting bracket should be at
least 20 mm away from the rooftop.




2
3 Installing the Optimizer Cable
NOTE
 Install optimizer cables as shown in the following figure. Failing to do so may damage the optimizer
or PV module.
 If an optimizer does not connect to any other device, connect the OUT+ and OUT- ports of the
optimizer respectively to the IN+ and IN– ports to protect the terminals from water.
 The optimizers in the same PV string can be installed in various orientations and tilts, and on
various types of PV modules. The following figure shows how optimizers are installed on the same
side of PV module frames.
 An optimizer should be less than 0.8 meter away from the connection box, and less than 2 meters
away from the next optimizer.
 An optimizer should be 1–350 meters away from the inverter.
 The Photovoltaic System Grounding shall be installed per the requirements of Sections 690.41
through 690.47 of the National Electrical Code, ANSI/NFPA 70 and is the responsibility of the
installer.
 The National Electrical Code, ANSI/NFPA 70 wiring mode must be used in onsite installation.
 Cable terminals from different manufacturers cannot be interconnected.


1. Connect the IN+ port and IN– port on the first optimizer respectively to the positive and negative
wiring terminals in the PV module connection box.
2. Connect the OUT– port on the first optimizer to the OUT+ port on the next optimizer.
3. Connect other optimizer cables in turn by following steps 1 and 2.
4. Connect the OUT– port on the last optimizer to the PV– port on the inverter.
5. Connect the OUT+ port on the first optimizer to the PV+ port on the inverter.


PV module connection box Inverter




NOTE
It is recommended that the positive and negative cables (PV+ and PV-) between the optimizer and
inverter be pulled straight and placed in parallel to avoid tangling.


4 Verifying the Installation
1. Check that all mounting brackets are securely installed and all screws are tightened.
2. Check that all cables are reliably connected with correct polarity and no short circuit.

5 Powering On the System
For details, see the description about inverter power-on.



3
Huawei Technologies Co., Ltd.
Huawei Industrial Base, Bantian, Longgang
Shenzhen 518129 People's Republic of China
www.huawei.com


4
Note:The preview effect may be slightly different from that of the source document. You can download the document and view it on your local PC.