The simulator in the OptiX OSN 6800 cannot be used to establish the pre-configuration.

Publication Date:  2012-07-25 Views:  36 Downloads:  0
Issue Description
The OptiX OSN 6800 and OptiX OSN 3800 cannot perform the pre-configurations like other NEs in the T2000. The pre-configuration operations can be implemented by using the Simulator. After the Simulator and T2000 start, an optical NE cannot be created. 
Alarm Information
Error code in the communication port: 98312 
Handling Process
In the creation of the OptiX OSN 6800 NE, the IP of the gateway NE should be set to the IP of the T2000 server. When the IP address of the T2000 server changes, the IP of the OptiX OSN 6800 gateway NE must change. Otherwise, the connection fails. 
Root Cause
For the configurations of the gateway NE IP address of the OptiX OSN 6800, the Simulator has strict requirements. 
Suggestions
None. 