No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Too many cross-connect services are configured caused cross-connection is uploaded or queried on the T2000, the operation times out.

Publication Date:  2012-07-25 Views:  37 Downloads:  0
Issue Description
when the actual cross-connection is uploaded or queried on the T2000, the operation times out, and the related operation fails
OSN 3500 V100R006C02B012SP05 
      
Alarm Information
the operation times out, and the related operation fails
Handling Process
1. We trying to warm reset the NE and query the SDH cross-connect services no thing change.
2. A X.C card switching and no thing change.
3. Delete NE and add it again at this time we received he operation times out, and the related operation fails.
4. We collect data using the data collection and RND analyzes it and advice to install V100R006C02B012SP06 patch.
Root Cause
 when the actual cross-connection is uploaded or queried on the T2000.
The host delivers the cross configuration. 
When More than 3,500 SDH cross-connect services are configured. In this case, the waiting for the cross-connect board response is long
Then the cross-connect board is cold reset, which results in no response for the cross-connect board. Thus the host checks timeout .
Suggestions
      Suggestions:
Install patch V100R006C02B012SP06 
Summary:
In case of cross-connection of OSN 3500 uploaded or queried on the T2000 operation times out and the related operation fails. And there are more than 3,500 SDH cross-connect services are configured. Install patch V100R006C02B012SP06

END