No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

The secospace TSM and dual machine SACG are unable to linkage.

Publication Date:  2012-09-12 Views:  484 Downloads:  0
Issue Description
TSM server
                                             |
                                           SW
                             ________|_________
                             |                                 |
                     SACG-1                       SACG-2
1 The dual SACG is used as backup, the SACG-1 and SACG-2 are in the same network segment with TSM server, their upstream are vrrp and hrp respectively;
2 The main SACG’s IP is the virtual address of VRRP;
3 The TSM and SACG can’t linkage.
Alarm Information
None.
Handling Process
Change the SACG’s IP address on TSM server.
Root Cause
The linkage between SACG and TSM server is negotiated through the physical interface, but not through VRRP virtual address.
Suggestions
There are situations as follows to the linkage of TSM sever and SACG unsuccessful:
1 key erros;
2 IP address configuration erros;
3 The consultation port of TSM is not open.

END