No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

The extension method of switch card of USG2200

Publication Date:  2012-09-21 Views:  3 Downloads:  0
Issue Description
After USG2200 configuring X86 card,it cannot use the switch fabric unit of multiport anymore.How to satisfy the need of much equipment accessing inside and outside in the situation of no adding equipment.
Alarm Information
None.
Handling Process
1、 Make the equipment add some 5FE card
2、 Part a VLAN and add all the switch interface to the VLAN
3、 Configuring interface vlanif
4、 The concatenation of some 5FE card by using network cable
Root Cause
None.
Suggestions
1、 This configuration apply small office (such as gas station, multiple shop and so on ),the client internal network equipment isn’t too much , the equipment require the space is small , the skill of maintenance person isn’t well and disagree with managing much equipment;
2、 The concatenation of some 5FE card is needed ,or the equipment in different subboard cannot connect each other;
3、 Because the internal interface of every card must be in different network segment ,if the X86 card confifured by client must use internal network address ,it must use the interface of X86 card,then connect 5FE card

END