No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FAQ-How does S9300 and non direct connection device configure GRE

Publication Date:  2012-11-14 Views:  45 Downloads:  0
Issue Description
Topology:(loopback1) router---s9300-1---ne80(n)---s9300-2(loopback0)

condition:
9300-1  and s9300-2  open gre tunnel,corresponding tunnel address is x.x.x.2 and x.x.x.1, router original address loopback1 data flow s9300-1 run GRE  TUNNEL。

version:S9300 V100R002C00SPC200+sph011
Alarm Information
NULL
Handling Process
acl number 3333                                                              
rule 5 permit ip source  loopback 1  0.0.0.255                                   
#                                                                            
traffic classifier hw operator or precedence 5                               
if-match acl 3333                                                           
                                                                          
#                                                                            
traffic behavior hw                                                                                                               
redirect interface Tunnel0/0/1         ---------the scene cannot REDIRECT IP-NEXTHOP Z.Z.Z.Z                                     
#                                                                            
traffic policy hw                                                            
classifier hw behavior hw
                                                                             
[Quidway]int g 1/0/0                                                                   
    [Quidway-GigabitEthernet1/0/0]traffic-policy  hw inbound

Root Cause
NULL
Suggestions
1.Software:S9300 V100R002C00SPC200+sph016 later support
2.hardware:inbound and outbound are enhancing version.
3.Configuration:redirect to next hop for realizing direct connection function,if it is not the direct connection, it must appoint the interface tunnel.
4.Environment:it does not support GRE TUNNEL load.

END