No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

VLL connection does not work between two sides on S7700

Publication Date:  2015-11-30 Views:  164 Downloads:  0
Issue Description

Our two S7700 switches as PE, customer wants to implement martini VLL on S7700. After finished the configuration, the communication between two sides is not ok.
The Topology is like below:
Client 1(10.1.32.2)(vlan 32) ----(vlan 1032) switch ---- (gi3/1/10.1032) PE2  ----- MPLS Network----- PE3(gi2/1/0.32) ------ Client2(10.1.32.1)

Configuration:
PE2:
interface GigabitEthernet3/1/1/10.1032
qinq termination pe-vid 1032 ce-vid 32
mpls l2vc 1.1.1.1 1032

PE3:
interface GigabitEthernet2/1/0.32
dot1q termination vid 32
mpls l2vc 10.10.10.10 1032

Alarm Information


 

Handling Process

1.Based on the configuration and VLL process, QinQ termination sub interface will not change the vlan tag and forward it to gi2/1/0.32.
For dot1q sub interface, S7700 will add one tag which will result PE3 send traffic to client2 with three tags. However, client2 cannot recoginze it and the communication is failed.
From the packet capture on port gi2/1/0.32, we confirm this point.


2.Based on above analysis, we need to delele the outer tag from client1. Suggest below configuration:

PE2:

PE3:

 

 

Root Cause

Dot1q sub interface will add one tag in VLL scenario.

Solution

Change Dot1q sub interface to QinQ vlan stacking sub interface in VLL scenario

END