Installing a Cabinet on the Antistatic Floor
Installing a Cabinet on the Cement Floor
Installing the Chassis and Boards
Installing and Routing Optical Fibers
Installing the Fiber Spool Box
Installing Doors of the Cabinet
Power on and Check the Equipment
02-A Operating Environment and Grounding Specifications
02-E The Requirements of Cabling and Bundling