Installing Cabinets on the Anti-static Floor
Installing Cabinets on the Concrete Floor
Installing Subracks and Boards
Installing and Laying Out Cables
Installing and Laying Out Fibers
Installing Fiber Management Trays
Installing Panels of the Cabinet
Checking the Hardware Installation
Powering On and Checking the Equipment
Operating Environment Requirements
02-D Requirements of Cabling and Bundling