No se encuentran recursos de mapeo en el idioma seleccionado.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our Private policy>

CX116 Pass-Through Module V100R001 User Guide 16

This document describes the CX116 gigabit Ethernet (GE) pass through module of the Tecal E9000 server (short for E9000) in terms of its features, installation, removal, and maintenance.
Rate and give feedback :
Huawei ha traducido este documento a diferentes idiomas combinando la traducción automática con la revisión humana a fin de permitirle entender mejor su contenido. Nota: Sin importar lo avanzada que sea, la traducción automática no puede igualar la calidad que proporcionan los traductores profesionales. Huawei no asume ninguna responsabilidad por la precisión de las traducciones y recomienda consultar el documento escrito en inglés (al cual puede acceder mediante el enlace proporcionado).
About this document

About this document

Purpose

This document describes the CX116 Gigabit Ethernet (GE) pass through module of the E9000 server in terms of its features, installation, removal, and maintenance.

Intended Audience

This document is intended for:

  • Technical support personnel
  • Maintenance personnel

Symbol Conventions

The symbols that may be found in this document are defined as follows.

Symbol Conventions

Symbol

Description

Indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury.

Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury.

Indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury.

Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results.

NOTICE is used to address practices not related to personal injury.

Calls attention to important information, best practices and tips.

NOTE is used to address information not related to personal injury, equipment damage, and environment deterioration.

Change History

Issue

Date

Description

16

2018-09-20

This issue is the sixteenth official release.

Deleted Supported Mezz Modules and Supported Cables in Compatibility.

15

2018-04-17

This issue is the fifteenth official release.

14

2017-03-27

This issue is the fourteenth official release, and includes the following changes:

Added product model descriptions to Appearance.

13

2016-11-30

This issue is the thirteenth official release,and includes the following changes:

Deleted the GE module description in Architecture.

12

2016-03-31

This issue is the twelfth official release,and includes the following changes:

  • Added the rates and quantities of internal and external ports in the logical structure diagram inArchitecture.
  • Modified the health indicator description in Indicators.

11

2015-11-09

This issue is the eleventh official release,and includes the following changes:

  • Modified the relationship between ports of the CX116 and MZ111 in Ports.
  • Added the long-term storage temperature and humidity to Technical Specifications.

10

2015-02-16

This issue is the tenth official release.

09

2014-09-15

This issue is the ninth official release,and includes the following changes:

"Tecal" is deleted from the product document.

08

2014-07-30

This issue is the eighth official release,and includes the following changes:

The storage temperature and altitude are updated in Technical Specifications.

07

2014-02-10

This issue is the seventh official release.

06

2013-11-18

This issue is the six official release,and includes the following changes:

The password change description is added to the operation scenarios in Changing the Password of the BMC.

05

2013-09-30

This issue is the fifth official release,and includes the following changes:

Ports is modified, for the port mapping between the CX116 and the MZ111 is added.

04

2013-08-30

This issue is the fourth official release,and includes the following changes:

Appearance is modified, for the figure of the positions and slots for installing the pass through modules is modified.

03

2013-06-20

This issue is the third official release.,and includes the following changes:

Changing the Password of the BMC is added.

02

2013-04-01

This issue is the second official release, and includes the following changes:

Technical Specifications is modified, for the Rated power is modified to Maximum power consumption.

01

2013-01-04

This issue is the first official release.

Traducción
Descargar
Updated: 2018-09-20

N.° del documento: EDOC1000015889

Vistas:4760

Descargas: 445

Average rating:
This Document Applies to these Products
Documentos relacionados
Share
Anterior Siguiente