Installing the Cabinet on the Antistatic Floor
Installing the Cabinet on the Cement Floor
Installing the Cable Distribution Plate
Installing the UPM Power System
Installing the Fiber Spool Box
Checking the Power Jumpers on the Board
Installing and Routing the Cables
Installing and Routing Fiber Jumpers
Installing the Orderwire Phone
Installing Doors of the Cabinet
Hardware Installation Checklist
Checking Fiber Jumper Connection
Installing the Subrack and the Boards
02-A Operating Environment Requirements
02-C Requirements of Cabling and Bundling
02-F Making and Testing Cable Connectors
02-G Installing Parts in the 19-inch Rack
02-H Installing Cables and Fibers in the 19-inch Rack