Installing a Cabinet on the Antistatic Floor
Installing a Cabinet on the Cement Floor
Installing Subracks and Boards
Installing and Routing Optical Fibers
Installing the DCM Frame and Airduct Frame
Installing the Orderwire Phone
Installing Doors of the Cabinet
Powering on and Checking the Equipment
02-A Operating Environment and Grounding Specifications
02-E The Requirements of Cabling and Bundling