Installing a Cabinet on the Antistatic Floor
Installing a Cabinet on the Cement Floor
Installing and Routing Optical Fibers
Installing the Fiber Management Tray
Installing Doors of the Cabinet
Power on and Check the Equipment
02-A Operating Environment and Grounding Specifications