Preparations for Commissioning
Commissioning and Configuration Procedure During Deployment
Commissioning Optical Power on Site
Remotely Commissioning Optical Power
Example of Commissioning Optical Power Based on 40 Gbit s Single-Wavelength System
Configuring Services and System Features
Checklist for Commissioning During Deployment
Backing Up the NE Database to the SCC Board
Analyzing and Handling Common Deployment Problems
Reference Operations for the Commissioning and Configuration