Preparations for Commissioning
Commissioning and Configuration Procedure During Deployment
Commissioning Optical Power on Site
Remotely Commissioning Optical Power
Example of Commissioning Optical Power Based on 40 Gbit s Single-Wavelength System
Example for Commissioning the Optical Power of the Coherent Transmission System
Configuring OTN Services and Service Protection
Testing Bit Errors Using A Signal Analyzer
Checklist for Commissioning During Deployment
Backing Up the NE Database to the SCC Board
Analyzing and Handling Common Deployment Problems
Reference Operations for the Commissioning and Configuration