Preparations for Commissioning
Commissioning and Configuration Procedure During Deployment
Automatically Commissioning Optical Power Through MDS 6630
Commissioning Optical Power on Site
Remotely Commissioning Optical Power
Example of Commissioning Optical Power Based on 40 Gbit s Single-Wavelength System
Example for Commissioning the Optical Power of the Coherent Transmission System
Configuring OTN Services and Service Protection
Testing Bit Errors Using A Signal Analyzer
Checklist for Commissioning During Deployment
Backing Up the NE Database to the SCC Board
Configuring the O M Function Based on Optical Doctor
Analyzing and Handling Common Deployment Problems
Reference Operations for the Commissioning and Configuration