Installing the Cabinet on the ESD Floor
Installing the Cabinet on the concrete floor
Installing the Cable Distribution Plate
Installing and Routing the Cables
Installing Doors of the Cabinet
Hardware Installation Checklist
Powering On the Equipment and Checking the Powered Equipment
02-A Operation Environment Requirements
02-D The Requirements of Cabling and Bundling