About This Document
Purpose
This document describes the basic storage services and explains how to configure and manage basic storage services.
Intended Audience
- Technical support engineers
- Maintenance engineers
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol |
Description |
---|---|
Indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury. |
|
Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury. |
|
Indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury. |
|
Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results. NOTICE is used to address practices not related to personal injury. |
|
Calls attention to important information, best practices and tips. NOTE is used to address information not related to personal injury, equipment damage, and environment deterioration. |
Change History
Changes between document issues are cumulative. The latest document issue contains all the changes made in earlier issues.
Issue 15 (2019-01-15)
This is the fifteenth official release, which includes the following updates:
Optimized the description in Basic Storage Service Description.
Issue 14 (2018-12-30)
This is the fourteenth official release, which includes the following updates:
Optimized the description in Managing Basic Storage Services.
Issue 13 (2018-08-30)
This is the thirteenth official release, which includes the following updates:
Optimized the description in Managing Basic Storage Services.
Issue 12 (2018-05-30)
This is the twelfth official release, which includes the following updates:
Optimized the description in Managing Basic Storage Services.
Issue 11 (2018-02-05)
This is the eleventh official release, which includes the following updates:
Optimized the descriptions about the chapter Creating a Storage Pool.
Issue 10 (2017-11-30)
This is the tenth official release, which includes the following updates:
Optimized descriptions about the chapter Creating a Disk Domain.
Optimized descriptions about bond ports.
Issue 09 (2017-10-30)
This is the ninth official release, which includes the following updates:
Optimized descriptions about the chapter Planning Disk Domains.
Issue 08 (2017-07-20)
This issue is the eighth official release. The updates are as follows:
Optimized the descriptions of adding a storage system to an LDAP domain.
Issue 07 (2017-05-10)
This issue is the seventh official release. The updates are as follows:
Optimized the configuration process of adding a storage system to an LDAP domain.
Issue 06 (2017-03-27)
This issue is the sixth official release. The updates are as follows:
Added description of cross-protocol share access.
Issue 05 (2016-11-20)
This issue is the fifth official release. The updates are as follows:
- Updated descriptions about the hot spare policy used for Planning the Capacity, Planning Disk Domains, and Creating a Disk Domain.
- Added descriptions about the FTPS protocol which is supported by V300R003C20.
- Updated the list of reserved system users.
- Optimized descriptions about some operation steps.
Issue 04 (2016-07-25)
This issue is the fourth official release. The updates are as follows:
- Added description of quota.
- Updated steps of Creating Storage Pool.
- Updated the example of available capacity calculation.
- Added description of CIFS share permissions.
- Added the Configuration of the NFSv4 service in a Non-Domain Environment.
Issue 03 (2016-04-30)
This issue is the third official release. The updates are as follows:
- Added the method of logging in to DeviceManager on the maintenance terminal through the management port of the storage system.
- Added configuring CIFS-NFS cross-protocol share access.
Issue 02 (2015-12-10)
This issue is the second official release. The updates are as follows:
Added grain descriptions in Basic Storage Principles; added restrictions on port bonding into and deleted logical port planning from Planning Networks; Clarified route adding principles in Configuring a Network.
Revised some ambiguous descriptions.
Issue 01 (2015-08-30)
This is the first official release.