(Video) FusionModule1000B 000B Prefabricated Modular Data Center Installation Video

Published On: 2019-03-07 Views: 10095 Downloads: 2080 Document ID: EDOC1000120285 Description:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Contents

01 Installation Precautions and Tools

02 Installing Pre-fab. Modular Bases

03 Removing Side Panels for Combining pre-fab. module

04 Hoisting and Securing Pre-fab. Modular

05 Installing Pre-fab.Modular (Concrete Podium Solution).

06 Leveling the Concrete Pad (Using the U-shaped Pipe Method)

07 Install Sealing Materials Between combine pre-fab. module

08 Installing Internal Structural Kits Between combine pre-fab. module

09 Grounding Pre-fab. Modular (Ground Cable)

10 Installing External Accessories

11 Installing Smart Cooling Product Outdoor Units on the Top of Containers

12 Vertically Installing Smart Cooling Product Outdoor Units on the Concrete Floor (38 kW Smart Cooling Product Outdoor Unit Support)

13 Connect water Refill And Drainage Pipes

14 Install the CE Fire Cylinder

15 Installing Fire Control Panel Batteries

16 Installing External Fire Alarm Horn Strobes

17 Installing Internal Cable Trays for combine pre-fab. module

18 Installing VESDA Pipes and Batteries

19 Installing the Raised Floor

20 Installing Aisle Doors for combine pre-fab. module

21 Installing UPS5000-E Power Modules

22 Installing and Connecting UPS5000-E Batteries

23 Installing Civil Air Conditioners for the NOC Container

24 Installing a Camera

25 Installing the VCN500 and Monitor Server

26 Connecting Monitoring and Fire Extinguishing Cables Inside Functional Zones

27 Connecting Power Cables Between Functional Zones

28 Connecting Power Cables Inside Functional Zones

29 Installing External Input Power Cables