E9000 Server V100R001 User Guide 25

This document describes the overview, functions, structure, installation, and configuration methods of the E9000.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing Signal Cables

Installing Signal Cables

Workflow

Figure 3-52 Process

Procedure

  1. Install a multi-port cable.

    The CH140, CH140 V3, and CH226 V3 do not have universal connector ports (UCPs). For these compute nodes, multi-port cables are not required.
    1. Press the two ejector release buttons on the multi-port cable. See (1) in Figure 3-53.
      Figure 3-53 Connecting the multi-port cable (CH121 as an example)
    2. Horizontally insert the multi-port cable into the UCP on the compute node. See (2) in Figure 3-53.

  2. Connect optical cables.

    1. Determine the type and installation position of the optical module based on site requirements.
    2. Insert the optical module into the optical port until the optical module clicks into place.
      Figure 3-54 Installing an optical module
    3. Remove the dustproof caps from the optical cable. See (1) in Figure 3-55.
      Figure 3-55 Connecting an optical cable
    4. Insert the optical cable into the optical module. See (2) in Figure 3-55.

  3. Connect a GE network cable or serial cable.

    Figure 3-56 Connecting a GE network cable or serial cable
    • The serial ports and GE electrical ports are standard RJ-45 ports, which are connected in the same way.
    • Before installing a network cable to a network port, check that the network cable connector is intact and the pins have no sundries or deformation.

  4. Lay out and bind GE network cables and serial cables.

    The Ethernet signal cables connecting cabinets do not support EMS. According to EMC requirements, the distance between the power cables and signal cables must be at least 100 mm (3.94 in.).

    1. Lay out the signal cables neatly along the cable organizers, bind the signal cables using cable ties, and use diagonal pliers to trim off the excess ends of cable ties so that there are no rough edges.
      Figure 3-57 Trimming off the excess ends of cable ties
    2. Remove the cut-off ends of the cable ties from the cabinet.

  5. Lay out and bind optical cables.

    1. Lay out optical cables neatly along the cable organizers, and bind the optical cables using the fiber binding tape.
      Figure 3-58 Binding optical cables using the fiber binding tape

      Use corrugated pipes to protect the optical cables that are routed across the cabinet.

    2. Bind optical cables using cable ties, and use diagonal pliers to trim off the excess ends of cable ties so that there are no rough edges.
      Figure 3-59 Trimming off the excess ends of cable ties
    3. Remove the cut-off ends of the cable ties from the cabinet.

Translation
Download
Updated: 2019-12-03

Document ID: EDOC1000015897