No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

E9000 Server V100R001 User Guide 24

This document describes the overview, functions, structure, installation, and configuration methods of the E9000.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing Switch Modules or Pass-Through Modules

Installing Switch Modules or Pass-Through Modules

The procedure for installing a pass-through module is the same as that for installing a switch module.

During operations, wear protective gloves to prevent personal injury.

Procedure

  1. Determine the slots for installing the switch modules or pass-through modules.

    A maximum of four switch modules or pass-through modules can be installed in an E9000 chassis. Figure 3-24 shows the slot numbers of the switch modules or pass-through modules.
    Figure 3-24 Slot numbers of the switch modules or pass-through modules

  2. Install switch modules or pass-through modules.

    1. Completely open the two ejector levers on a switch or pass-through module, and horizontally insert the switch or pass-through module into the chassis. See (1) and (2) in Figure 3-25.
      Figure 3-25 Installing a switch or pass-through module
    2. Completely close the two ejector levers on the switch or pass-through module. See (3) in Figure 3-25.
    3. Use a Phillips screwdriver to tighten the two M3 captive screws on the switch or pass-through module. See (4) in Figure 3-25.
    4. Repeat 1 to 3 to install other switch or pass-through modules.

Translation
Download
Updated: 2019-08-30

Document ID: EDOC1000015897

Views: 95601

Downloads: 5266

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next