No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

E9000 Server V100R001 User Guide 24

This document describes the overview, functions, structure, installation, and configuration methods of the E9000.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Verifying the Installation

Verifying the Installation

Verifying the Chassis Installation

Verify the chassis installation against the check items in Table 3-2. Rectify any item that does not meet the requirements.

Table 3-2 Verifying the chassis installation

No.

Check Item

Check Result

1

Labels on the chassis are clear and properly pasted.

  

2

Screws for securing the chassis are properly installed.

  

3

Paint on the chassis is not scraped and the surface is not stained. Otherwise, apply paint or clean up the stains.

  

4

Filler panels are installed in all vacant slots.

  

5

The instruction manual and accessories delivered with the product are intact.

  

Verifying the Cable Installation

Verify the cable installation against the check items in Table 3-3. Rectify any item that does not meet the requirements.

Table 3-3 Verifying the cable installation

No.

Check Item

Check Result

1

Cables are properly routed in the cabinet, complying with Huawei's cable layout specification.

  

2

Power cables and PGND cables are properly connected.

  

3

PGND cables and power cables are intact without joints.

  

4

Power cables and PGND cables are straight and not coiled.

  

5

Power cables, PGND cables, and signal cables are bound separately, and the distance between a power cable and a signal cable and the distance between a PGND cable and a signal cable meet requirements.

  

6

Cables are not installed above the heat dissipation holes.

  

7

Cable ties are evenly spaced and properly fastened.

  

8

The bending radius of a cable meets the specifications.

  

9

The installed cables do not block the indicators or hinder component replacement.

  

10

The unused optical cable connectors are covered by protective caps, and the unused optical modules are protected by dustproof covers.

  
Translation
Download
Updated: 2019-08-30

Document ID: EDOC1000015897

Views: 90903

Downloads: 5238

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next