E9000 Server V100R001 User Guide 24

This document describes the overview, functions, structure, installation, and configuration methods of the E9000.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Unpacking the Chassis Packing Case

Unpacking the Chassis Packing Case

Procedure

  1. Check the packaging and the seal on the packing case.

    NOTE:

    If the packing case is damaged (for example, the packing case is wet or deformed, or the seal or pressure-sensitive tape is unsealed), preserve onsite evidence and report the actual conditions to the supplier or Huawei Technologies Co., Ltd.

  2. Use a pallet truck to carry the chassis to the equipment room, and remove the pallet truck.

    Figure 3-2 Carrying a chassis

  3. Use a box cutter to cut the pressure-sensitive tape on the packing case, and unpack the case.

    Exercise caution when using the box cutter. Improper operations may cause personal injury or equipment damage.

    Figure 3-3 Unpacking the case

  4. Check whether the chassis and its components are complete.

    Table 3-1 Bill of materials

    No.

    Material

    Quantity

    1

    Chassis

    1

    2

    Management module

    Depending on the contract

    3

    Switch module

    Depending on the contract

    4

    PSU

    Depending on the contract

    5

    Fan module

    Depending on the contract

    6

    Guide rail

    2 (optional)

    7

    Floating nut hook

    1

    8

    Network cable

    Depending on the contract

    9

    Power cable

    Same as the number of PSUs

    10

    Product documentation bag

    NOTE:

    The product documentation bag contains a copy of Huawei Server Warranty, an E9000 chassis installation template, and a copy of the E9000 Server Quick Start Guide.

    1

Translation
Download
Updated: 2019-08-30

Document ID: EDOC1000015897

Views: 90634

Downloads: 5237

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next