CH222 Compute Node V100R001 User Guide 18

This document describes the appearance, functions, structure, and installation, removal, and configuration methods of the CH222 compute node.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing an iBBU

Installing an iBBU

You need to install an intelligent backup battery unit (iBBU) to replace the original one.

Scenarios

Install an iBBU in any of the following scenarios:

  • The iBBU is faulty.
  • An iBBU of a new model needs to be used.

Figure 5-13 shows the iBBU installation position on the CH222.

Figure 5-13 iBBU installation position

Prerequisites

Conditions

Data

Data preparation is not required for this operation.

Tools

  • Electrostatic discharge (ESD) gloves.
  • Packing materials, for example, ESD bags.

Hardware

New iBBU.

Procedure

  1. Take the new iBBU out of its ESD bag.
  2. Put the iBBU into the iBBU box. See step (1) in Figure 5-14.

    Figure 5-14 Installing an iBBU

  3. Install the cable for the iBBU to the cable connector of the RAID controller card. See step (2) in Figure 5-14.
Translation
Download
Updated: 2019-08-16

Document ID: EDOC1000018075

Views: 6968

Downloads: 321

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share