No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

CH222 Compute Node V100R001 User Guide 18

This document describes the appearance, functions, structure, and installation, removal, and configuration methods of the CH222 compute node.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing the Cover

Installing the Cover

You need to install the CH222 cover after replacing the CH222 components.

Scenarios

Install the CH222 cover after replacing the CH222 components.

Prerequisites

Conditions

  • Refer to Safety Instructions.
  • If a compute node is installed in the E9000 chassis, remove it by referring to Removing a Hard Disk.
  • Place the compute node carefully on an electrostatic discharge (ESD) floor.

Data

Data preparation is not required for this operation.

Tools

Electrostatic discharge (ESD) gloves.

Procedure

  1. Insert the bottom tabs of the cover into the matching slots in the CH222 chassis, and place the cover vertically on the CH222. See step (1) in Figure 5-10.

    Figure 5-10 Installing the CH222 cover

  2. Push the cover back in place on the CH222. See step (2) in Figure 5-10.
Translation
Download
Updated: 2019-08-16

Document ID: EDOC1000018075

Views: 6597

Downloads: 321

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next