No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

CX913 Switch Module V100R001C10 User Guide 15

This document describes the CX913 10GE switch module (CX913 for short) of the Tecal E9000 server in terms of its features, installation, removal, and configuration. This document applies to the CX913 whose 10GE switching planes use the software versions of 1.2.1.0.39, 2.00 and later.
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Powering On or Off a Switching Plane

Powering On or Off a Switching Plane

This topic describes how to power on or off the 10GE switching plane of CX913.

Scenarios

Remotely power on the 10GE switching plane of CX913 using the MM910 WebUI.

Use any of the following methods to power on the CX913:

  • Power on all switching planes of the CX913 on the MM910 WebUI. Details are provided later in this topic.
  • On the MM910 CLI, run the powerstate command to power on or off the switching planes of the CX913. For details, see MM910 Management Module V100R001 Command Reference.
  • On the BMC CLI, run the powerstate command to power on or off the switching planes of the CX913. For operation details, see E9000 Server V100R001 iMana 200 User Guide.
  • If the chassis is not powered on, power it on, and all the switching planes of the CX913 will be powered on with the chassis. This topic does not provide the operation details.
  • If the chassis is powered off, the 10GE switching plane of the CX913 are powered off with the chassis.
  • If the chassis is powered on but the CX913 is not installed, install the CX913, and all switching planes of the CX913 are automatically powered on after installation. This topic does not provide the operation details.
  • If the chassis is powered on and the CX913 is installed, remove the CX913 to power off the 10GE switching plane.

When any one switching plane of the CX913 is powered on or off, all switching planes of the CX913 are powered on or off.

Impact on the System

When one switching plane of the CX913 is powered off, services running on all switching planes of the CX913 stop.

Prerequisites

Conditions

  • The RS–232 serial port on the PC is connected to the serial port marked with SYS on the CX913 panel.
  • The MM910 is powered on.
  • The current configuration data has been saved.

Data

No data preparation is required for this operation.

Software

PuTTY.exe is free software. You can download it from the Internet. PuTTY 0.60 or later is required for login over a serial port.

Procedure

Power on or off switching planes on the MM910 WebUI.

  1. Log in to the MM910 WebUI.

    For details, see Logging In to the HMM WebUI.

  2. Choose Pem&Fantray.

    The Pem&Fantray page is displayed.

  3. In the navigation tree on the left of the Pem&Fantray page, choose Power Supply Management > Power Control.

    Figure 6-4 Power Control page

  4. Power on or off the 10GE switching plane of a specific switch module.

    fabric indicates the 10GE switching plane.

  5. Refresh the page and check the latest power-on and power-off status of the switch module.
Translation
Download
Updated: 2018-09-20

Document ID: EDOC1000036345

Views: 13440

Downloads: 183

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next