No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

RH5885 V3 Server V100R003 User Guide 32

This document describes the appearance, specifications, parameters, and structure of the RH5885 V3, and how to install an OS, replace parts, and install, remove, configure, and troubleshoot the server.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing the Supercapacitor

Installing the Supercapacitor

  1. Power off the server. For details, see Powering On and Off the RH5885 V3. Remove all power cables.
  2. Remove the chassis cover of the RH5885 V3. For details, see Removing the Chassis Cover.
  3. Remove the riser card tray above the RAID controller card. For details, see Removing the Riser Card.
  4. Remove the air duct of the RH5885 V3. For details, see Removing the Air Duct.
  5. Wear an ESD wrist strap or ESD gloves. For details, see Safety Instructions.
  6. Take the spare supercapacitor out of the ESD bag.
  7. Insert the trans flash module (TFM) vertically into the RAID controller card. See step (1) in Figure 5-59.

    Figure 5-59 Installing the supercapacitor

  8. Insert the supercapacitor vertically into the tray until the supercapacitor is secured by the plastic latches. See step (2) in Figure 5-59.
  9. Enable the supercapacitor tray to closely touch the chassis, align the chassis notch with the supercapacitor tray, and push the supercapacitor tray in the arrow direction. See step (1) in Figure 5-60.

    Figure 5-60 Installing the supercapacitor tray

Translation
Download
Updated: 2019-10-21

Document ID: EDOC1000040297

Views: 106719

Downloads: 1582

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next