No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

CX11x, CX31x, CX710 (Earlier Than V6.03), and CX91x Series Switch Modules V100R001C10 Configuration Guide 12

The documents describe the configuration of various services supported by the CX11x&CX31x&CX91x series switch modules The description covers configuration examples and function configurations.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Maintaining NQA

Maintaining NQA

This section describes how to maintain an NQA test instance. You can restart the test instance and clear the statistics on the test result to maintain a test instance.

Clearing NQA Test Statistics

Context

To obtain the latest test results, clear the current test results by running the following commands.

  • Statistics cannot be restored after being cleared. Confirm the action before you run the commands.
  • Statistics on the running test instance cannot be cleared.

Procedure

  1. Run:

    system-view

    The system view is displayed.

  2. Run:

    nqa test-instance admin-name test-name

    The NQA view is displayed.

  3. Run:

    clear-records

    The statistics about NQA test instances are cleared.

Translation
Download
Updated: 2019-08-09

Document ID: EDOC1000041694

Views: 57978

Downloads: 3621

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next