Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Network Deployment Solution with 10GE Switches for the Front-End and Back-End Networks (an Electric Power Project)

Network Deployment Solution with 10GE Switches for the Front-End and Back-End Networks (an Electric Power Project)

This section describes an OceanStor 9000 network deployment solution used for an electric power project. The front-end and back-end networks share a pair of 10GE switches. Although the front-end and back-end networks use the same switches, they are separated by VLANs. A management switch is used as the management network switch.

Download
Updated: 2018-10-27

Document ID: EDOC1000042140

Views: 7757

Downloads: 122

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next