No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

CX210 Switch Module V100R001 User Guide 14

This document describes the CX210 multi-plane switch module of the E9000 server in terms of its features, installation, removal, and configuration.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing the CX210

Installing the CX210

Prerequisites

Tools

The following tools are available:

  • Protective gloves
  • Electrostatic discharge (ESD) gloves
  • Phillips screwdriver (PH3 is 8 mm or 0.31 in.)

Workflow

Figure 3-1 Installation process

Procedure

  1. The chassis has been installed.
  2. Determine the position for installing the CX210 in the chassis. Figure 3-2 shows the slot numbers.

    Figure 3-2 Slot numbers

  3. Remove the switch module filler panel.

    1. Use a Phillips screwdriver to loosen the two M3 captive screws on the switch module filler panel. See (1) in Figure 3-3.
      Figure 3-3 Removing the switch module filler panel
    2. Raise the two handles on the switch module filler panel completely, and pull the filler panel horizontally out of the chassis. See (2) and (3) in Figure 3-3.
    3. Store the switch module filler panel for future use.

  4. Install the CX210.

    1. Raise the two ejector levers on the CX210 completely and push the CX210 horizontally into the chassis as far as it will go. See (1) and step (2) in Figure 3-4.
      Figure 3-4 Installing the CX210
    2. Lower the two ejector levers on the CX210 until the CX210 is completely inserted. See (3) in Figure 3-4.
    3. Use a Phillips screwdriver to tighten the two M3 captive screws on the CX210. See (4) in Figure 3-4.

  5. Determine the connection relationships between signal cables and ports on the CX210. Figure 3-5 shows the port types and numbers of the CX210.

    Figure 3-5 Port types and numbers

    1

    BMC serial port

    2

    SYS serial port

    3

    8G FC optical port

    -

    -

  6. (Optional) Connect a serial cable.

    Figure 3-6 Connecting a serial cable
    NOTE:

    The BMC serial port, SYS serial port, are standard RJ-45 ports and are connected in the same way.

  7. Connect a 8GE optical module and optical fiber.

    1. Determine the optical module type and the optical port to be connected depending on site requirements.
    2. Push the optical module into the optical port until the optical module is locked in place, as shown in Figure 3-7.
      Figure 3-7 Installing an optical module
    3. Remove the dust-proof cap from the optical fiber. See (1) in Figure 3-8.
      Figure 3-8 Connecting an optical fiber
    4. Insert the optical fiber into the optical module. See (2) in Figure 3-8.

  8. Check the indicator status after the CX210 is powered on.

    For details, see Table 2-5.

  9. Follow-up Procedure

    See section Configuring the CX210.

Translation
Download
Updated: 2019-08-09

Document ID: EDOC1000053379

Views: 23028

Downloads: 618

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next