No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Troubleshooting Guide

CloudEngine 16800, 12800, 12800E, 8800, 7800, 6800, and 5800 Series Switches

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Must Four Consecutive 10GE Ports Be Simultaneously Configured for a Stack of CE6800 Series Switches?

Must Four Consecutive 10GE Ports Be Simultaneously Configured for a Stack of CE6800 Series Switches?

Among CE6800 series switches, if 10GE ports of the CE6857EI, CE6850EI, CE6810EI, or CE6810LI need to be configured as physical member ports, four ports with consecutive port numbers 4N+1 through 4N+4 (N is a natural number) must be simultaneously configured. This restraint does not apply to other CE6800 models.

Translation
Download
Updated: 2020-01-07

Document ID: EDOC1000060766

Views: 607169

Downloads: 2948

Average rating:
This Document Applies to these Products

Related Version

Related Documents

Share
Previous Next