No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

X6800 Server V100R003 User Guide 13

This document describes the Huawei X6800 server (X6000 for short) in terms of its appearance, features, specifications, system components, device installation, cable connections, and installation verification.
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Operation Instructions

Operation Instructions

This topic describes the instructions for operating the server.

To minimize ESD damage, observe the following precautions:

  • Lay ESD floors or ESD cushions in the entire equipment room, and use ESD chairs. The equipment room is equipped with ESD clapboards, ESD screens, and ESD curtains.
  • All floor-standing electric devices, metal frames, and metal rack shells in the equipment room must be directly grounded. All electric meters or tools on a workbench must be connected to the common ground point in the workbench.
  • Monitor the temperature and humidity in the equipment room. The heating system reduces indoor humidity and increases ESD.
  • Place components in ESD bags or boxes during transportation or storage.
  • An operator must wear an ESD wrist strap when installing or removing a server component. Ensure that the ground terminal of the ESD wrist strap is inserted into the ESD jack in the rack.
  • Both ends of an ESD wrist strap must be in good contact. One end contacts your bare skin, and the other is securely inserted into the ESD jack in the rack.
  • During replacement, keep new server components in ESD bags before installation, and place removed server components on ESD plastic foam cushions for temporary storage.
  • Do not touch welding joints, pins, or exposed circuits.
Translation
Download
Updated: 2018-09-06

Document ID: EDOC1000066339

Views: 29669

Downloads: 1686

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next