X6800 Server V100R003 User Guide 13

This document describes the Huawei X6800 server (X6000 for short) in terms of its appearance, features, specifications, system components, device installation, cable connections, and installation verification.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Precautions

Precautions

This topic describes the precautions for connecting cables.

NOTICE:

Before connecting power cables to the devices in a rack, ensure that the power distribution cabinet (PDC) in the equipment room and the power distribution box (PDB) in the rack are switched off.

Table 3-4 describes the precautions for connecting an AC power cable, high-density cable, and data cable to the chassis in a rack.

Table 3-4 Precautions for connecting cables

Task

Description

Connecting a power cable

Determine the output wiring terminal of the PDB.

Connecting a high-density cable

Locate the high-density port on the front panel of a server node and understand the method of connecting a high-density cable.

Connecting Ethernet cables to service and management network ports

Understand the mapping between server nodes and service and management network ports at the rear of the chassis.

Connecting a converged management network cable

Understand the mapping between the management network port on the management module or chassis mounting ear and upper-layer switch ports.

Laying out cables

Route all cables along the inner side of each cable trough for the rack. Bind the cables along the inner sides of the mounting bars on both sides of the rack. For details, see Laying Out Cables.

Verifying cable connections

Check that all cables are correctly connected and connectors are securely inserted.

Translation
Download
Updated: 2018-09-06

Document ID: EDOC1000066339

Views: 37895

Downloads: 1720

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next