X6800 Server V100R003 User Guide 13

This document describes the Huawei X6800 server (X6000 for short) in terms of its appearance, features, specifications, system components, device installation, cable connections, and installation verification.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Verifying Cable Connections

Verifying Cable Connections

This topic describes how to verify cable connections.

Operation Scenario

Verify cable connections in any of the following scenarios:

  • You need to check cable connections during routine maintenance.
  • You need to check cable connections during troubleshooting.

Precautions

To avoid device damage or personal injury, ensure that the chassis is powered off and the rack busbar is switched off before verification.

Procedure

  1. Check that all cables are of correct types.
  2. Check that the cable length is appropriate.
  3. Check that the cables around the connectors are not twisted.
  4. Check that all cables are laid out as required.
  5. Check that the power cables, ground cable, high-density cables, and network cables are properly connected. For details, see Table 3-5.

    Table 3-5 Cable connection checklist

    Check Item

    Description

    Power cables

    • All power cables are properly connected to power supply units (PSUs).
    • Power cables are securely connected.

    Ground cable

    The ground cable is properly connected to the ground bar of the rack.

    High-density cables

    • High-density cables are properly connected to the high-density ports on server nodes.
    • High-density cables are securely connected.

    Network cables

    Network cables are correctly connected to the specified management or service network port.

Translation
Download
Updated: 2018-09-06

Document ID: EDOC1000066339

Views: 38040

Downloads: 1720

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next