No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

X6800 Server V100R003 User Guide 13

This document describes the Huawei X6800 server (X6000 for short) in terms of its appearance, features, specifications, system components, device installation, cable connections, and installation verification.
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Powering Off

Powering Off

You need to power off the chassis before replacing a part due to a chassis or part fault or inspecting the chassis or parts.

Procedure

  1. Ensure that all services and programs on the server are stopped or have been switched over to other devices.
  2. Power off the server nodes. For details, see the power-off sections of their user guides.
  3. Disconnect the chassis power cable from the external power supply to power off the chassis.
Translation
Download
Updated: 2018-09-06

Document ID: EDOC1000066339

Views: 29966

Downloads: 1686

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next