CX710 Switch Module V100R001 User Guide 12

This document describes the CX710 40GE converged switch module of the E9000 server in terms of its features, installation, removal, and configuration.

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing the CX710

Installing the CX710

Prerequisites

Tools

The following tools are available:

  • Protective gloves
  • Electrostatic discharge (ESD) gloves
  • Phillips screwdriver (PH2 is 6 mm or 0.25 in.)

Workflow

Figure 3-1 Installation process

Procedure

  1. Determine the position for installing the CX710 in the chassis.

    Figure 3-2 Slot numbers

  2. Remove the switch module filler panel.

    1. Use a Phillips screwdriver to loosen the two M3 captive screws on the switch module filler panel. See (1) in Figure 3-3.
      Figure 3-3 Removing the switch module filler panel
    2. Raise the two handles on the switch module filler panel completely, and pull the filler panel horizontally out of the chassis. See (2) and (3) in Figure 3-3.
    3. Store the switch module filler panel for future use.

  3. Install the CX710.

    1. Raise the two ejector levers on the CX710 completely and push the CX710 horizontally into the chassis as far as it will go. See (1) and step (2) in Figure 3-4.
      Figure 3-4 Installing the CX710
    2. Lower the two ejector levers on the CX710 until the CX710 is completely inserted. See (3) in Figure 3-4.
    3. Use a Phillips screwdriver to tighten the two M3 captive screws on the CX710. See (4) in Figure 3-4.

  4. Determine the connection relationships between signal cables and ports on the CX710.

    Figure 3-5 Port types and numbers

    1

    BMC serial port

    2

    SYS serial port

    3

    40GE optical port

    -

    -

  5. Connect a serial cable, as shown in Figure 3-6.

    Figure 3-6 Connecting a serial cable

    The BMC serial port, SYS serial port, are standard RJ-45 ports and are connected in the same way.

  6. Connect a 40GE optical module and optical fiber.

    1. Determine the optical module type and the optical port to be connected depending on site requirements.
    2. Remove dust-proof caps from the optical module and optical fiber, as shown in Figure 3-7.
      Figure 3-7 Removing dust-proof caps
    3. Insert the optical fiber into the optical module. See (1) in Figure 3-8.
      Figure 3-8 Installing an optical fiber and optical module
    4. Insert the optical module into the optical port until the optical module is locked. See (2) in Figure 3-8.

  7. Check the indicator status after the CX710 is powered on.

    For details, see Table 2-4.

  8. Follow-up Procedure

    See section Configuring the CX710.

Translation
Download
Updated: 2019-12-04

Document ID: EDOC1000069172

Views: 32281

Downloads: 463

Average rating:
This Document Applies to these Products

Related Version

Related Documents

Share
Previous Next