No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

5288 V3 Server V100R003 User Guide 26

This document describes the features, appearance, and technical specifications of the 5288 V3 server, and how to install, power on, and power off the 5288 V3 server, connect cables, and install an operating system (OS) for it.
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing an AC PSU

Installing an AC PSU

Install an AC power supply unit (PSU) to replace the original one.

An AC PSU needs to be added to improve reliability when only one AC PSU is configured for the 5288 V3.

Procedure

  1. Wear an ESD wrist strap. For details, see Safety Instructions.
  2. Remove the PSU to be replaced. For details, see Removing an AC PSU.
  3. Take the spare AC PSU out of its ESD bag.
  4. Push the spare AC PSU along the guide rails into a slot until the PSU clicks into place.

    The PSU latch snaps in so that the PSU does not move. See Figure 7-18.

    Figure 7-18 Installing an AC PSU

  5. Connect the power cable to the PSU.

Translation
Download
Updated: 2018-11-26

Document ID: EDOC1000080031

Views: 125875

Downloads: 2333

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next