No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

5288 V3 Server V100R003 User Guide 26

This document describes the features, appearance, and technical specifications of the 5288 V3 server, and how to install, power on, and power off the 5288 V3 server, connect cables, and install an operating system (OS) for it.
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Verifying Cable Connections

Verifying Cable Connections

Before verifying cable connections, ensure that the power is off. Any incorrect or loose connection may cause personal injury or equipment damage.

Table 3-3 lists the cable connection checklist.

Table 3-3 Cable connection checklist

Item

Description

Power cable

The power cable is connected correctly to the rear of the chassis.

Network cable

Network cables are connected correctly to the management Ethernet ports or service Ethernet ports on the rear panel of the chassis.

Ground cable

The 5288 V3 server does not provide a separate ground port. It is grounded through the ground cable of a power cable. Ensure that the power cables of the PSUs are in good contact.

Translation
Download
Updated: 2018-11-26

Document ID: EDOC1000080031

Views: 127096

Downloads: 2333

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next