No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

5288 V3 Server V100R003 User Guide 26

This document describes the features, appearance, and technical specifications of the 5288 V3 server, and how to install, power on, and power off the 5288 V3 server, connect cables, and install an operating system (OS) for it.
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing a Fan Module

Installing a Fan Module

Install a fan module to replace the original one or after replacing other components (such as the mainboard and DVD drive).

Procedure

  1. Wear an ESD wrist strap. For details, see Safety Instructions.
  2. Remove the fan module to be replaced. For details, see Removing a Fan Module.
  3. Take the spare fan module out of its ESD bag.
  4. Insert the fan module along the guide rails into the slot. Check that the fan cable connector is securely inserted into the mainboard connector. See Figure 7-31.

    NOTE:

    The fan modules are hot-swappable. You can skip steps 6 to 8 when you can open the chassis cover without removing the server. The scenarios include but are not limited to: (1) the server is installed on holding or adjustable guide rails and (2) the server is not installed in a cabinet.

    Figure 7-31 Installing a fan module

  5. Install the chassis cover. For details, see Installing the Chassis Cover.
  6. Install the 5288 V3. For details, see Installing the Server.
  7. Connect all internal cables such as power and network cables. For details, see Connecting External Cables.
  8. Power on the 5288 V3. For details, see Powering On the Server.
Translation
Download
Updated: 2018-11-26

Document ID: EDOC1000080031

Views: 140522

Downloads: 2336

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next