No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

5288 V3 Server V100R003 User Guide 26

This document describes the features, appearance, and technical specifications of the 5288 V3 server, and how to install, power on, and power off the 5288 V3 server, connect cables, and install an operating system (OS) for it.
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing an SD Card Board

Installing an SD Card Board

Install an SD card board to replace the original one.

Procedure

  1. Wear an ESD wrist strap. For details, see Safety Instructions.
  2. Remove the SD card board to be replaced. For details, see Removing an SD Card Board.
  3. Take the spare SD card board out of the ESD bag.
  4. (Optional) If SD card 2 needs to be installed, install it first. For details, see Installing an SD Card.

    NOTE:

    After the SD card board is replaced, the positions of SD card 1 and SD card 2 cannot be reversed. SD card 1 is above the SD card board, and SD card 2 is below the SD card board.

  5. Align the SD card board connector with the port on the mainboard, and press the SD card board downwards to secure it to the mainboard. See step (1) in Figure 7-105.

    Figure 7-105 Installing an SD card board

  6. Tighten the two screws. See step (2) in Figure 7-105.
  7. Install SD card 1. For details, see Installing an SD Card.

    NOTE:

    After the SD card board is replaced, data in the original SD card can be retained and RAID takes some time to rebuild. Please wait.

    During RAID rebuilding, you can view the progress and status on the iBMC event log page.

  8. Install the chassis cover. For details, see Installing the Chassis Cover.
  9. Install the RH1288 V3. For details, see Installing the Server.
  10. Install all external cables, such as power cables and network cables. For details, see Connecting External Cables.
  11. Power on the RH1288 V3. For details, see Powering On the Server.
Translation
Download
Updated: 2018-11-26

Document ID: EDOC1000080031

Views: 126082

Downloads: 2333

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next