No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

5288 V3 Server V100R003 User Guide 26

This document describes the features, appearance, and technical specifications of the 5288 V3 server, and how to install, power on, and power off the 5288 V3 server, connect cables, and install an operating system (OS) for it.
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing the Air Duct

Installing the Air Duct

Install an air duct to replace the original one or after replacing a CPU, DIMM, or supercapacitor.

Procedure

  1. Wear an ESD wrist strap. For details, see Safety Instructions.
  2. Remove the air duct to be replaced. For details, see Removing the Air Duct.
  3. Take the spare air duct out of its ESD bag.
  4. Align the positioning pin on the air duct with the fixing hole by following instructions on the chassis and place the air duct downwards so that the pins on four corners of the air duct fit into the dents on the chassis. See Figure 7-27.

    Figure 7-27 Installing the air duct

  5. Optional: Install the supercapacitor tray on the air duct in the arrow direction. See Figure 7-28.

    Figure 7-28 Installing the supercapacitor tray

  6. Install the chassis cover. For details, see Installing the Chassis Cover.
  7. Install the 5288 V3. For details, see Installing the Server.
  8. Connect all internal cables such as power and network cables. For details, see Connecting External Cables.
  9. Power on the 5288 V3. For details, see Powering On the Server.
Translation
Download
Updated: 2018-11-26

Document ID: EDOC1000080031

Views: 140394

Downloads: 2336

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next