No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

5288 V3 Server V100R003 User Guide 26

This document describes the features, appearance, and technical specifications of the 5288 V3 server, and how to install, power on, and power off the 5288 V3 server, connect cables, and install an operating system (OS) for it.
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Removing the Server and Holding Rails

Removing the Server and Holding Rails

  1. Wear an ESD wrist strap or ESD gloves. For details, see Safety Instructions.
  2. Power off the server. For details, see Powering On and Off the Server.
  3. Disconnect all power cables and signal cables from the server.
  4. Remove the server.

    1. Loosen the captive screws on the server panel using a screwdriver. See (1) in Figure 3-35.
      Figure 3-35 Removing the server from the holding rails

    2. Pull out the server along the guide rails away from the cabinet as far as the server will go. See (2) in Figure 3-35.
    3. Pull the release button upwards, and pull the server out. See (1) and (2) in Figure 3-36.
      Figure 3-36 Removing a server from holding rails

    4. Place the removed server onto an ESD platform.
    5. Pull the release button outwards, and remove the inner rail. See (1) and (2) in Figure 3-37.
      Figure 3-37 Removing an inner rail

  5. Remove the front end of the holding rail.

    1. Hold down the plate on the front end of the holding rail and pull out the hook. See (1) and (2) in Figure 3-38.
      Figure 3-38 Removing a holding rail
    2. Push the holding rail out of the square holes. See (3) in Figure 3-38.
    3. Remove the front end of the holding rail. See (4) in Figure 3-38.
    4. Push the plate into the holding rail. See (5) in Figure 3-38.
    5. Remove the rear end of the holding rail.

      Lift the positioning pin and remove the holding rail from the square holes. See (6) and (7) in Figure 3-38.

  6. Remove the other guide rail on the opposite side in the same way.
Translation
Download
Updated: 2018-11-26

Document ID: EDOC1000080031

Views: 137405

Downloads: 2336

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next