No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Parts Replacement 12

OceanStor 18500 V3 and 18800 V3 Mission Critical Storage System V300R003

This document describes the procedure for replacing the parts of storage system in terms of safety operations, preparations, and precautions.
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Removing the SVP

Removing the SVP

This section describes how to remove the SVP.

Impact on the System

An SVP must be powered off before the replacement. As a result, services and programs running on the SVP will be interrupted.

Prerequisites

The SVP is heavy so that at least two persons are required to move it.
  • A spare SVP for replacement is ready.
  • The SVP that you want to replace has been located.
  • Data is backed up for the SVP before it is removed. The following data needs to be backed up:
    • IP address of a management network port on the SVP
    • User names and passwords of all SVP built-in users
    • User names and passwords separately created by the Windows operating system, which must be re-created and re-added after the SVP replacement
    • User name and password of the storage system
    • Optional: Data in Windows VMs
    • License (Backup is needed when OfficeScan License is in use.)
  • All running services and programs on the SVP are stopped, then power off the SVP.

Tools and Materials

  • ESD wrist strap or ESD gloves.
  • Flat-head screwdriver.

Procedure

  1. Power off the SVP.
  2. Disconnect all power cables and signal cables from the SVP.
  3. Loosen the captive screws on the SVP panel using a screwdriver. See step (1) in Figure 7-13.

    Figure 7-13  Removing the SVP

  4. Pull out the SVP along the guide rails away from the rack. See step (2) in Figure 7-13.
  5. Place the removed SVP on the ESD table.
Translation
Download
Updated: 2019-05-15

Document ID: EDOC1000084105

Views: 23003

Downloads: 140

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next