No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Administrator Guide 15

OceanStor 5300 V3, 5500 V3, 5600 V3, 5800 V3, and 6800 V3 Storage System V300R003

Routine maintenance activities are the most common activities for the storage device, including powering on or off the storage device, managing users, modifying basic parameters of the storage device, and managing hardware components. This document applies to the system administrators who are responsible for carrying out routine maintenance activities, monitoring the storage device, and rectifying common device faults.
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Modifying a Management Port

Modifying a Management Port

When the networking mode between a storage device and a maintenance terminal changes, modify the settings of management port parameters to ensure proper communication between them.

Context

Modifying management ports interrupts communication between the storage device and the maintenance terminal.

Procedure

  1. Log in to DeviceManager.
  2. Choose System.
  3. Select the controller enclosure where the management port resides.
  4. Click to switch to the rear view.
  5. Click the management port whose information you want to view.

    The Management Port dialog box is displayed.

  6. Modify the management port.
    1. Click Modify.



    2. In the IPv4 Address or IPv6 Address text box, enter an IP address for the management port.
    3. In the Subnet Mask or Prefix text box, enter a subnet mask or prefix for the management port.
    4. In the IPv4 Gateway or IPv6 Gateway text box, enter a gateway for the IP address of the management port.
  7. Confirm the management port modification.
    1. Click Apply.

      The security alert dialog box is displayed.

    2. Confirm the information in the dialog box and select I have read and understand the consequences associated with performing this operation..
    3. Click OK.

      The Success dialog box is displayed, indicating that the operation succeeded.

    4. Click OK.
Translation
Download
Updated: 2019-04-17

Document ID: EDOC1000084191

Views: 85671

Downloads: 2298

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next