No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

CH225 V3 Compute Node V100R001 User Guide 07

This document describes the appearance, functions, and structure of the CH225 V3 storage expansion compute node (CH225 V3 for short), and methods of installing, removing, and configuring the CH225 V3.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing a Supercapacitor

Installing a Supercapacitor

This section describes the precautions and procedure for installing a supercapacitor to a CH225 V3.

Scenarios

Install a supercapacitor in either of the following scenarios:

  • A supercapacitor fails and is to be replaced.
  • A supercapacitor is to be replaced with a new model.
NOTE:

When an LSISAS2208 or LSISAS3108 RAID controller card is installed, you can install a supercapacitor to prevent cache data from being lost in case of power failures.

Figure 8-54 shows the position of the supercapacitor.

Figure 8-54 Position of the supercapacitor

Prerequisites

Conditions

Data

Data preparation is not required for this operation.

Tools

  • Electrostatic discharge (ESD) wrist strap.
  • M3 Phillips screwdriver.
  • Packaging materials, for example, an ESD bag.

Hardware

Spare supercapacitor.

Procedure

  1. Take the trans flash module (TFM) out of the ESD bag.
  2. Remove the RAID controller card off the mainboard. For details, see Removing the Supercapacitor.
  3. Vertically place the TFM on the RAID controller card while aligning the screw holes on the TFM with connectors (bolts) on the RAID controller card, and tighten the two screws using a Phillips screwdriver. See steps (1) and (2) in Figure 8-55.

    Figure 8-55 Installing a TFM

  4. Vertically place a supercapacitor box on the TFM, align the screws that secure the supercapacitor box with the screw holes on the RAID controller card, and use a Phillips screwdriver to tighten the two screws for securing the TFM. See steps (1) and (2) in Figure 8-56.

    Figure 8-56 Installing a supercapacitor box

  5. Take a new supercapacitor out of the ESD bag.
  6. Horizontally push the supercapacitor into the capacitor box until the supercapacitor is secured by the plastic latches. See step (1) in Figure 8-57.

    Figure 8-57 Installing a supercapacitor

  7. Connect the supercapacitor's 6-pin cable to the RAID controller card. See step (2) in Figure 8-57.
Translation
Download
Updated: 2019-07-10

Document ID: EDOC1000095351

Views: 7686

Downloads: 74

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next