No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

CH225 V3 Compute Node V100R001 User Guide 07

This document describes the appearance, functions, and structure of the CH225 V3 storage expansion compute node (CH225 V3 for short), and methods of installing, removing, and configuring the CH225 V3.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Powering On the CH225 V3

Powering On the CH225 V3

Scenario

You can use any of the following methods to power on the compute node:

  • If the chassis is powered off, power it on. The compute node is powered on along with it.
  • If the chassis is powered on and the compute node is not installed, the compute node is powered on automatically after it is installed.
  • If the chassis is powered on and the installed compute node is abnormal, hold down the power button on the front panel for 6 seconds to power off the compute node and press the power button again to power it on.
  • If the chassis is powered on and the compute node is powered off:

    This section describes how to use the MM910 WebUI to remotely power on the compute node.

Procedure

  1. Verify that the chassis, power cables, PSUs, and fan modules have been installed properly.
  2. Log in to the MM910 WebUI. For details, see Logging In to the MM910 WebUI.
  1. On HMM Web, choose PSUs&Fans.
  2. On the left panel, choose Power Management > Power Control.

    Figure 4-1 Power control

  3. Select one or more compute nodes and click Power On.

    The selected compute nodes are powered on.

    NOTE:

    Selecting the check box marked in red in Figure 4-1 means selecting all compute nodes. Clicking Power On powers on all compute nodes.

Translation
Download
Updated: 2019-07-10

Document ID: EDOC1000095351

Views: 8166

Downloads: 74

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next