Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document.
Note: Even the most advanced machine translation cannot match the quality of professional translators.
Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
RM/4/SYS_RCH_MAX6_RT_LMT
Message
RM/4/SYS_RCH_MAX6_RT_LMT:The number of IPv6 routes reached the upper limit [paf-ipv6-route-limit] in the system when the upper limit of routes in the IPv6 URT was checked.
Description
The number of IPv6 routes reached the upper limit in the entire system when the maximum number of routes in the IPv6 URT was checked.
Parameters
Parameter Name | Parameter Meaning |
---|---|
[paf-ipv6-route-limit] | Indicates the maximum number of IPv6 routes defined in the PAF file. |