No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Log Reference

AR120, AR150, AR160, AR200, AR1200, AR2200, AR3200, and AR3600 V200R007

This document supports all the logs of device, including the parameters, meaning, possible causes and solution.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
GRE/4/GRE_MAXNUM_UNCAMP

GRE/4/GRE_MAXNUM_UNCAMP

Message

GRE/4/GRE_MAXNUM_UNCAMP:The number of GRE tunnels [tunnel-number1] configured on the old main control board is greater than the maximum number of GRE tunnels [tunnel-number2] that can be configured on the new main control board.

Description

The number of GRE tunnels on the main control board running the system software of the previous version before the master-slave switchover was larger than the maximum number of GRE tunnels permitted on the main control board running the system software of the new version.

Parameters

Parameter Name Parameter Meaning
[tunnel-number1] Number of the current GRE tunnels on the main control board running the system software of the previous version before the master-slave switchover
[tunnel-number2] Maximum number of configurable GRE tunnels permitted on the main control board running the system software of the new version after the master-slave switchover

Possible Causes

The number of permitted GRE tunnels on the main control board is reduced in the new system software version. As a result, the number of GRE tunnels on the master main control board running the old system software version was larger than the maximum number of GRE tunnels permitted on the main control board running the new system software version.

Procedure

  • Check specifications and configurations and ensure that, after the mater-slave switchover the maximum number of configurable GRE tunnels on the main control board running the system software of the new version is larger than the number of GRE tunnels on the main control board running the system software of the previous version. You can purchase more PAF files/licenses from Huawei to make specifications satisfied. Otherwise, some configurations will be lost.
Translation
Download
Updated: 2019-05-29

Document ID: EDOC1000097209

Views: 83199

Downloads: 181

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next