No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Log Reference

AR500, AR510, and AR530 V200R007

This document supports all the logs of device, including the parameters, meaning, possible causes and solution.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
RM/4/RCH_PUB6_RT_LMT

RM/4/RCH_PUB6_RT_LMT

Message

RM/4/RCH_PUB6_RT_LMT:The number of IPv6 routes for the public network reaches the upper limit [paf-pub-limit], when the number of IPv6 routes in the routing table is checked.

Description

The number of IPv6 public network routes reached the upper limit when the number of IPv6 routes in the routing table was checked.

Parameters

Parameter Name Parameter Meaning
[paf-pub-limit] Maximum number of IPv6 public network routes defined in the PAF

Possible Causes

The number of IPv6 public network routes reached the upper limit.

Procedure

  1. Check whether routes are correct.
  2. Delete invalid routes.
  3. Check whether the configuration meets networking requirements.
  4. Collect log information and configuration information, and then contact technical support personnel.
Translation
Download
Updated: 2019-05-29

Document ID: EDOC1000097294

Views: 62106

Downloads: 31

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next