No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Common Operation Guide

CloudEngine 12800, 12800E, 8800, 7800, 6800, and 5800 Series Switches

Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Configuring Layer 2 Port Isolation

Configuring Layer 2 Port Isolation

Figure 1 shows the application scenario for Layer 2 port isolation. PC1, PC2, and PC3 belong to VLAN 10. After GE1/0/1 connecting to PC1 and GE1/0/2 connecting to PC2 are added to a Layer 2 port isolation group, PC1 and PC2 cannot communicate with each other in VLAN 10, but they can communicate with PC3.

NOTE:

The CE6870EI, CE6875EI, CE12800 and CE12800E series switches only support Layer 2 port isolation group.

Figure 15-2  Configuring Layer 2 port isolation

# Configure Layer 2 port isolation on GE1/0/1.

<HUAWEI> system-view
[~HUAWEI] interface ge 1/0/1
[~HUAWEI-GE1/0/1] port-isolate enable group 1
[*HUAWEI-GE1/0/1] quit
[*HUAWEI] commit

# Configure Layer 2 port isolation on GE1/0/2.

[~HUAWEI] interface ge 1/0/2
[~HUAWEI-GE1/0/2] port-isolate enable group 1
[*HUAWEI-GE1/0/2] quit
[*HUAWEI] commit
Translation
Download
Updated: 2018-10-08

Document ID: EDOC1000102369

Views: 144830

Downloads: 3160

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next